Past Activity

Fall Creek Trail

  • Start date: 03/23/1983

  • Start time: 12:00 AM

  • End date: 03/23/1983

  • End time: 11:59 PM

  • Event Leader: Smith Helen

  • Assistant Leader:

  • Event category: Trail Maintenance

  • Area Type:

  • Departure Location: See Trip Description

  • Rating:

  • Roundtrip total drive miles:

  • Season: 1983

  • Permits Required:

  • Event Status: Passed

  • Supplies and Equipment Required:

  • participant prerequisites:

  • Conditions:

  • Total Distance:

  • Member Fees:

  • Elevation Gain:

  • Non-Member Fees:

  • Committee: Trail Maintenance

  • Junior member fees:

Trip Report

A work party to repair handrails on bridge #2 on the Fall Creek Trail was successful in its planned operation. The winter, a year ago had knocked some of the handrails off and last year had taken the rest. Two floor planks were broken off and had to be replaced, the old handrail poles were pulled out of the ravine and put back in place. Then the next bridge had a rail off which was also replaced. Trail workers were Mary Bridgeman, John and Pete Cecil, Steve Kraft, Fred Schepman, and leader Helen Smith.

Members & Guests signed-up & waitlisted

No. Status Full name Phone Transportation Needed? Trip Fee # Can Take?

There are currently no confirmed participants for this event.