Past Activity

Eugene/12 Bridges Extension

  • Start date: 05/01/2015

  • Start time: 12:00 AM

  • End date: 05/01/2015

  • End time: 11:59 PM

Description:

We'll cycle from Martin Street via the streets and path to EWEB, crossing our first bridge: The De Fazio. We'll work our way up river crossing briefly into Springfield. The route will continue back on the Willamette River going both down and up river. We'll return to Martin Street via Pearl Street, the path and East Amazon Drive.

  • Event Leader: Richard Hughes

  • Event Leader Phone: 541-579-3098

  • Event Leader Email: hughes97405@gmail.com

  • Assistant Leader:

  • Event category: Trips

  • Area Type:

  • Departure Location: Amazon Park, 28th & Hilyard entrance parking lot

  • Rating: Moderate

  • Roundtrip total drive miles:

  • Season: 2015

  • Permits Required:

  • Event Status: Passed

  • Supplies and Equipment Required: Bring a bike in good working order along with a spare tube, air pump, water, snack and a good attitude.

  • participant prerequisites:

  • Conditions:

  • Total Distance: 26

  • Member Fees: 1

  • Elevation Gain: 453

  • Non-Member Fees: 5

  • Committee: Trips

  • Junior member fees: —

Trip Report

The weather was perfect as we rode the lanes and paths in Eugene/Springfield. We visited 12 bridges, seven of which have significant history as to the funding, utility and even timing to get them built. 7 of the riders researched their assigned bridge giving the group details of each structure. Others added historical comments as well.