Past Activity

Castle Rock Trail

  • Start date: 05/03/2000

  • Start time: 12:00 AM

  • End date: 05/03/2000

  • End time: 11:59 PM

  • Event Leader: Dave Predeek

  • Event Leader Phone: 15413455531

  • Event Leader Email: dpredeek@msn.com

  • Assistant Leader:

  • Event category: Trail Maintenance

  • Area Type:

  • Departure Location: See Trip Description

  • Rating:

  • Roundtrip total drive miles:

  • Season: 2000

  • Permits Required:

  • Event Status: Passed

  • Supplies and Equipment Required:

  • participant prerequisites:

  • Conditions:

  • Total Distance:

  • Member Fees:

  • Elevation Gain:

  • Non-Member Fees:

  • Committee: Trail Maintenance

  • Junior member fees:

Trip Report

This was our third annual Castle Rock trail maintenance session. Working conditions were ideal as it was cool with a light rain. Steve at McKenzie Ranger Station got some tools for us and we began at King Road near Belknap covered bridge and walked uphill 4 miles trimming brush, cutting small logs and removing limbs from the trail. Flowers in bloom were Oregon grape, trillium, red-flowering currant and oxalis. The five trail crew members were Elliot Aronin, Max Brown, Helen Liguori, Clare Tucker and leader Dave Predeek.

The March Bulletin is now online.

 

REI Grand Re-Opening this Friday/Saturday, 10am-5pm! The Obsidians will have a table inside, wear your Obsidian gear and come say hi! Lots of vendors inside and out.

X