Past Activity

Scio Covered Bridges

  • Start date: 07/15/2006

  • Start time: 12:00 AM

  • End date: 07/15/2006

  • End time: 11:59 PM

  • Event Leader: Sharon Ritchie

  • Event Leader Phone: 541-342-8435

  • Event Leader Email: trehugr@comcast.net

  • Assistant Leader:

  • Event category: Trips

  • Area Type:

  • Departure Location: See Trip Description

  • Rating: Moderate

  • Roundtrip total drive miles: 115

  • Season: 2006

  • Permits Required:

  • Event Status: Passed

  • Supplies and Equipment Required:

  • participant prerequisites:

  • Conditions:

  • Total Distance: 45

  • Member Fees: —

  • Elevation Gain:

  • Non-Member Fees: —

  • Committee: Trips

  • Junior member fees: —

Trip Report

This is everyone's favorite ride. The weather was perfect, high clouds, cool breeze in the morning, warm sunshine in the afternoon. We started with a brisk discussion of safety issues following introductions. Good suggestions were made. Then off to a hill climb and ridge ride with wonderful views. A great run downhill and then rolling hills and flatland as we visited five covered bridges. Several were built in 1936 and all had been restored. We ate lunch at Larwood Park and the site of the third bridge. My sincere thanks to Mike BeBout for taking the lead and keeping us from getting lost on the many left turn/right turns as well as confronting the nasty dog on the long downhill. As usual, a wonderful day and a great group of people!

Members: Mike BeBout, Paul Brown, Barb Bruns, Walt Davis, Lyn Gilman-Garrick, Sylvia Harvey, Darrell McBee, Sharon Ritchie (leader), Guy Strahon and Judy Terry. Nonmembers: Paul Garrick, Lloyd McEntire and Art Sather. <img border="2" src="images/IMG_0210_1.jpeg" width="800" height="600">
.

Save the dates! Summer Camp 2027 August 22-28.

X