Past Activity

Spencer Butte

  • Start date: 10/26/2013

  • Start time: 12:00 AM

  • End date: 10/26/2013

  • End time: 11:59 PM

Description:

We will be continuing to work on the Ridgeline Trail in the Northeastern portion of Spencer Butte Park. Our tasks will include cutting back brush along the trail sides, armoring ditches and culverts with rocks, and adding gravel to smooth the trail in preparation for additional graveling.

  • Event Leader: Matt Bell

  • Event Leader Phone: 503-884-8829

  • Event Leader Email: matthew.v.bell@gmail.com

  • Assistant Leader:

  • Event category: Trail Maintenance

  • Area Type: Urban

  • Departure Location: 52nd & Willamette Trailhead

  • Rating: Moderate

  • Roundtrip total drive miles:

  • Season: 2013

  • Permits Required:

  • Event Status: Passed

  • Supplies and Equipment Required: Weather and work appropriate footwear and clothing. All tools, equipment, gloves, and even some snacks will be provided by the City Parks and Open Spaces Division.

  • participant prerequisites:

  • Conditions:

  • Total Distance: 2

  • Member Fees:

  • Elevation Gain: 500

  • Non-Member Fees:

  • Committee: Trail Maintenance

  • Junior member fees:

Trip Report

For this month's outing we continued our work to improve the Ridgeline Trail up from the Willamette & 52nd trailhead. We again met up with Christer from EPOS and worked to add rock retaining walls, gravel, and clear drain features such as ditches culverts and open drains.

Clara and Roberta worked to clear the trailsides of overhanging vegetation. Jim and Dan operated the power-wheelbarrows that kept us supplied with gravel and rocks. A slight source of amusement was the breaking of the on-off switch on the City's newest power-wheelbarrow, which was made lighthearted by Dan's ability to get it running without the nob of the switch being on the machine. Tom worked to add a retaining wall to ease the slope of a climbing turn on a switchback and even Oliver tried to help level the foundations for the rocks.