Past Activity

Water Treatment/waste plant tours

  • Start date: 03/13/2015

  • Start time: 12:00 AM

  • End date: 03/13/2015

  • End time: 11:59 PM

Description:

What's in Your Water Bottle?
This trip is for anyone who has wondered how river water becomes tap water, and how wastewater is made safe for wildlife and others downstream.

Eugene's clean water input and wastewater output deserves our attention because it is central to our homes, community, and local economies. We pay for water services every month, but what do we pay for?

Every day, two facilities:
- Filters water from the McKenzie River to serve the needs of over 200,000 people; and
- Treats wastewater equivalent in volume to 106 Olympic-sized swimming pools before returning it to the Willamette River.

We will visit these facilities in one trip consisting of 2 separate tours; the first one-hour tour is to the Water Filtration Plant in Springfield, the second hour-and-a-half tour will be to the Wastewater Treatment Plant in Eugene.

Driving directions/maps will be provided.

Schedule:
12:50 pm - gather
1:00 pm - depart/carpool
1:30 pm - 2:30 pm - Filtration plant in Springfield (EWEB)
2:30 pm - 3:00 pm - drive
3:00 pm - 4:30pm - Treatment Plant in Eugene (MWMC)
5:00 pm - return to Amazon lot

  • Event Leader: Mark Hougardy

  • Event Leader Phone: 541-206-9532

  • Event Leader Email: hougardy@gmail.com

  • Assistant Leader:

  • Event category: Trips

  • Area Type: Urban

  • Departure Location: Amazon Park, 28th & Hilyard entrance parking lot

  • Rating: Easy

  • Roundtrip total drive miles: 28

  • Season: 2015

  • Permits Required:

  • Event Status: Passed

  • Supplies and Equipment Required: Hand Sanitizer will be provided. Bring rain gear, sun hat, layered clothes, and pack any snack items/water. The below rules seem like no-brainers, but the two facilities have requested that I supply this information to participants. The Hayden Bridge Filtration Plant has requested the following: 1. Please register in the Visitors log book. 2. Stay with your group leader. 3. No high heels or open toed shoes. Also, scarves or loose shirt tales etc. 4. Do not touch the equipment. 5. No Smoking. 6. Watch your step; floors might be slippery. 7. In case of emergency, follow your group leader. The Wastewater Treatment Plant has requested to following rules be observed by participants: 1. Please walk at all times in a line of pairs (or single-file). 2. Wear comfortable clothing and shoes; the entire tour is outside and includes a lot of walking. NO OPEN TOED SHOES. 3. Follow the path of the tour guide. Please do not walk on curbs or in landscaping. 4. No food or drinks on the tour. 5. Limit touching- it is fine to use handrails on stairs, but don’t touch railings in front of water or pick anything up off of the ground. 6. Upon returning home, remember to wash your hands again.

  • participant prerequisites:

  • Conditions:

  • Total Distance: 2

  • Member Fees: 1

  • Elevation Gain:

  • Non-Member Fees: 5

  • Committee: Trips

  • Junior member fees: —

Trip Report

What’s in your water bottle? How does river water become the tap water we drink and how is wastewater made safe for wildlife and others downstream? To learn more a small group of Obsidians spent a Friday afternoon visiting the local water intake and the wastewater facilities.

Our first visit was to the Hayden Bridge Water Filtration Plant, located adjacent to the McKenzie River, in Springfield. The facility is no small operation; it serves the needs of 200,000 people on a daily basis by removing water directly from the river, treating it, and finally delivering it to our taps. Here are some observations from our hour long visit:

# The facility is very high-tech and water quality is measured at all stages of the process both by computer and by human with hourly lab checks.
# Security is a paramount; the plant is gated with a security fence/gate, cameras are everywhere.
# Our local water system has about two days of water reserves if there is a calamity.
# On the day we visited the facility had processed and was sending out 16 million gallons (24 Olympic sized swimming pools) of water to the surrounding community.

Next, we traveled to the Eugene / Springfield Water Pollution Control Facility in Eugene. This is where all of the waste materials that go down the drain from our households and businesses are processed. The plant is located adjacent to the Willamette River and bordered to the north by the Beltline. Our hour and a half visit was very informative, and included:

# More than 99% of what arrives at the facility is water; less than 1% are solid materials that need to be either removed or turned into bio-solids.
# Most of the odoriferous gases are collected and used to power a generator that supplies 50-60% of the energy needs of the facility.
# Waste materials can take up to 10 hours, once they leave your home, until it reaches the wastewater facility; then wastewater can take another 10 hours to be processed. In short, waste materials take less than 24 hours until that water is returned to the river.
# The amount of water being cleaned and being returned to the Willamette River that day was about 15 million gallons (roughly 23 Olympic swimming pools).
# During the summer, the plant can process up to 70 million gallons per day (106 Olympic swimming pools) of wastewater!